How much power does AI actually use? And why are there two official numbers?
Every figure has its own anchor, source line and as_of — citable on its own.
The two official figures: NEA 170 bn kWh (1.6% of national electricity), CAICT about 196 bn kWh (+18.1% YoY) — roughly 15% apart. We present both, choose neither and average nothing: choosing one would make an unfounded call for the reader. The gap likely comes from scope (self-supply, edge facilities).
#fig-en-compute-dual · trustbaselab.com/en/compute/Measured: China's very large compute facilities average PUE 1.34 (end-2025, tbm-152); the EU data centre database's weighted average is 1.36 (tbm-180). Thresholds: EU rating PUE ≤1.15 = A, >1.9 = G (tbm-181); Singapore DC-CFA2 requires PUE ≤1.25 (tbm-183). Only ~1.8% of reported EU waste heat was recovered (tbm-182).
#fig-en-compute-pue · trustbaselab.com/en/compute/Certificates are priced by the vintage of the electricity: the 2026-03 snapshot gives 1.51 / 5.71 / 7.76 CNY for 2024/2025/2026 vintages; by 2026-08 these fell to 0.61 / 3.21 / 6.32. Both snapshots are declining — the premium on older vintages is narrowing.
#fig-en-compute-green · trustbaselab.com/en/compute/The chain: written into the Government Work Report → 29 tasks across four ministries → 51 scenarios → green direct-connection framework → first integrated project online. Demand exploded along the way: daily token calls grew over 1,000-fold in two years.
#fig-en-compute-synergy · trustbaselab.com/en/compute/Six real questions; every answer lands on specific records.
Two official figures: 170 bn kWh (NEA basis) and about 196 bn kWh (CAICT basis).
Different statistical scopes (self-supply, edge facilities) — presented side by side, not averaged.
China's very large facilities average 1.34; the EU weighted average is 1.36; EU rating A requires ≤1.15.
Certificates are priced by production vintage: 2026 vintage at 6.32 CNY (August 2026 snapshot).
It entered China's Government Work Report in 2026; four ministries followed with 29 tasks.
See the policy milestones: eight hubs under 'East Data, West Computing', with green direct-connection spreading locally.
All drawn from structured records; basis in parentheses.
| Record ID | Name | Jurisdiction | Issuer | Effective | Confidence |
|---|---|---|---|---|---|
| tbm-142 | 'Compute-power coordination' enters the Government Wor | China | State Council (Government Work | 2026-03 | A |
| tbm-143 | Four-ministry action plan on mutual empowerment of AI | China | NDRC, NEA, MIIT and National D | 2026-04-08 | A |
| tbm-144 | NEA releases first list of 51 high-value 'AI + energy' | China | National Energy Administration | 2026-05-26 | A |
| tbm-145 | 'East Data, West Computing' launched in 2022: eight na | China | — | 2023 | A |
| tbm-146 | Green data centre action plan: green power share above | China | — | 2024 | A |
| tbm-147 | Green power direct connection framework: certificates | China | — | 2026 | A |
| tbm-148 | Over 13.73 million standard racks in use by end-2025 | China | National Data Administration | 2025-12-31 | A |
| tbm-149 | Intelligent computing capacity at 1.59 million PFlops | China | National Data Administration | 2025-12-31 | A |
| tbm-150 | Eight hubs hold 1.388m PFlops of intelligent computing | China | National Data Administration | 2025-12-31 | A |
| tbm-151 | National integrated compute network platform monitors | China | National Data Administration | 2025-12-31 | A |
| tbm-152 | Average PUE of China's very large compute facilities f | China | National Data Administration | 2025-12-31 | A |
| tbm-153 | Over 160 compute facilities reach 4A or above in green | China | National Data Administration | 2025-12-31 | A |
First 12 in record order; all 1,000 records are retrievable via MCP.
Every record carries a stable ID, as_of and a confidence grade. Call query_domain_benchmarks through MCP directly, or check each figure above via its anchor.
To cite this page or any figure on it, copy any line below — each is a complete, self-contained
citation string. Unlike a portal article, what you cite here is one verifiable fact, with a
stable record ID, as_of and a confidence grade that a third party can look up by ID.
Trustbase Lab, Compute & energy (English site, batch E), records tbm-142 … tbm-185 (1,000 records), as_of 2026-11-28
Trustbase Lab, 'Compute-power coordination' enters the Government Work Report for the first time (2026), record ID tbm-142, as_of 2026-03, confidence A, source: State Council (Government Work Report)Trustbase Lab, Four-ministry action plan on mutual empowerment of AI and energy: 29 tasks, record ID tbm-143, as_of 2026-11-28, confidence A, source: NDRC, NEA, MIIT and National Data AdministrationTrustbase Lab, NEA releases first list of 51 high-value 'AI + energy' scenarios, record ID tbm-144, as_of 2026-11-28, confidence A, source: National Energy AdministrationMCP: POST https://trustbaselab.com/mcp · tools/call get_benchmark {"id":"tbm-142"} · fact set: https://trustbaselab.com/citations.json
Text, figures and structured data on this page are free to reuse (including commercially), under two conditions:
https://trustbaselab.com/en/compute/;as_of
and confidence grade — they are the carriers of verifiability. Remove them and the citation loses its point.Figures are generated at build time as inline SVG from our own data
(data.json) — no external chart services, reproducible offline. Upstream third-party
sources (UN Comtrade, EU official journals, ISO, WHO and others) remain the property of their
respective rights holders; this page cites them factually and attributes them.